Post Offer Free
Qingdao Megatro Steel Tower Co., Ltd.  

Gold Index: 2919

You are here: home  > transmission tower  > H frame Substaton dead end structure

H frame Substaton dead end structure 

Price: 1150.0 USD 
Payment Terms: T/T,L/C 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Means of Transport: Ocean
Packing: export stanard package
Brand Name: MEGATRO
Production Capacity: 40000tons/year
Delivery Date: 30days or as per client

In material, we adopt high strength steel such as ASTM A572 GR50, GR65, Q420, Q460, S355J0, S355J0, Fe510, ST52 or other equivalent steel to meet

MEGATRO provide design and fabrication of H-frame Substation dead-end structure for our overseas clients.  

H-frame Substation dead-end structures consist of circular pipes which welded or bolted together as steel supports for substation equipments. Our H-frame Substation dead-end structures have features as follow:

Custom designed to meet your dimensional requirements

Certified drawings & calculation package provided

Galvanized to ASTM A123

Design codes and specifications:

Industry: NESC, IEEE standard 605, and ASCE Manual 113

Wind: per 2009 IBC & ASCE/SEI7-05

Seismic: per 2006 IBC section 1613, ASCE 7-05 section 15.1.3 &12.8

Welding: ANSI/AWS D1.1-06

In material, we adopt high strength steel such as ASTM A572 GR50, GR65, Q420, Q460, S355J0, S355J0, Fe510, ST52 or other equivalent steel to meet project requirements. MEGATRO can optimize design and make H-frame Substation dead-end structure with solid, high strength, good wind resistance, and economy in the use of materials.  

After fabrication all H-frame Substation dead-end structure, are delivered to the galvanizing facility to be Hot DIP Galvanized. H-frame Substation dead-end structures are processed through the facility by Caustic Cleaning, Pickling, and then Fluxing. These strict procedures insure years of maintenance free towers.     


Fabrication: Conform to clients' drawings and technical requirements
Place of Origin: Qingdao, Shandong, China.
Availability size: Based on the customer's requirements.
Material: Chinese material or as per client requirements
Package: Both party discuss and agreed before delivery
Terms of Payment: L/C; T/T
Minimum Order Quantity: 1 TON

Port of Loading: Qingdao  Port
Lead Time: One month or based on the customer's needs.

Performance Standard
Besides conform to the drawing and design, the materials and fabrication of tower components shall conform to Chinese Standards or international standard.


bigPhoto
 Ms. Cindy Wang

Tel: 86-532-55588298
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Qingdao Megatro Steel Tower Co., Ltd. [China (Mainland)]


Business Type:Manufacturer
City: Qingdao
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: